Track Construction: Grading

The first step was to re-grade the right-of-way.

Within just a few months, this two-track gravel road...
...became a graded, prepared right-of-way--with trolley poles--ready to receive track.
Grading is complete, all the way to the future site of the pocket track at the end of the line.

<< Preparation of this area required determined efforts to remove a HUGE chunk of sandstone embedded in the foot of the mountain.